US$ 1049.50
Pay in 4 interest-free payments of $11.24 Learn more
Loading Rack: 3-1/8 x 3-3/4" 7
Technical Specification: Length: 412mm Frog Angle: 8 Degrees Radius: 1828mm
14 to 128 speed steps are as natural as 2- and 4-digit addresses
CONTENTS 500g
WINNER - HORNBY MAGAZINE AWARDS 2021 - BEST N GAUGE LOCOMOTIVE
4P-020-212 GWR Toplight Mainline City Twin City Chocolate & Cream All 3rd 3906 Set 3 Product-Multi-Pack-6 Loading Rack: 3-1/8 x 3-3/4"The first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 1049.50
US$ 440.00
US$ 20.00
US$ 26.00
US$ 30.00
US$ 1552.50
Sold : Login>>